Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.
20.11.13 – 06.12.13: Planned Work at Preseli
Leave a Reply
Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.