Category Archives: network

Call for Ramadan Services for DAB

We are interested in hearing from anyone who would like to operate a Ramadan service on the following DAB multiplexes during June and July 2014:

Interested parties are invited to answer this questionnaire, after which we will discuss opportunities to contract for capacity for up to 28 days on each available multiplex.

Please fill in the questionnaire by 5pm on 31st March 2014

All contracts for capacity are subject to the availability of suitable capacity on each multiplex.  If there are multiple expressions of interest, and more demand for capacity than is available, we will select services on the basis of ability to enter a standard carriage contract rather than first come basis.

We intend to notify interest parties in April.

Any questionnaire submissions that are received after the date specified above, will still be considered for a licence, but subject to capacity availability.

The fee to broadcast on any of the multiplexes will be £2,000+VAT for the 28 days, subject to contract, and you will be required to get your signal to the multiplex centre (which we can describe in more detail after submission of the form).

All successful service providers are reminded that they will need to hold the necessary DSP licence from Ofcom and comply with the requirements of the Ofcom Broadcasting Code, in particular if they wish to broadcast charity appeals and must take reasonable steps to satisfy itself that the charity appeal organisation concerned can produce satisfactory evidence of charitable status, or, in the case of an emergency appeal, that a responsible public fund has been set up to deal with it.   Further details can be found at: http://stakeholders.ofcom.org.uk/broadcasting/broadcast-codes/broadcast-code/commercial-references-radio/.

If you have any questions about this opportunity please contact [email protected]

Muxco WCL: Update 20th November 2012

The transmitter builds are progressing but telecoms delays continue to hamper our ability to currently announce a launch date.

More positively, we’re excited to see our multiplexers commissioned and installed into the rack.  Here are a couple of pictures.  You can see that there are two IPCs – one is the main and one is the backup; they’re otherwise identical.  The multiplexing software is loaded up and all the information on the services is programmed in.   The other things in the rack are GPS clocks and routers.  This is the heart of our multiplex and we can’t wait to bring the whole thing to life as soon as we can.

Launching DAB Multiplexes

I am excited to have joined the team at Muxco and have spent some time over the last couple of weeks getting up to speed with the forthcoming launches, which I will be overseeing. Matt has suggested I post on here periodically to keep those who are interested up to speed with the process.

As a priority I shall be getting to know the service providers on our planned multiplexes and ensuring they are informed and happy about the process to launch. There are some regulatory loose ends being tied up too, to ensure we are making the best use of the available spectrum.

I have overseen lots of DAB multiplex launches but the regulatory and industry landscape changes every year (or every month at the moment), and no two multiplexes are exactly the same. Having said that, if these launches are anything like the ones that have gone before, I am fully expecting the following – speaking generally:

  • The first wave of work will be a flurry of requests for maps, contact details and contracts.
  • There will be an agonising wait to build a key transmitter, as local councillors argue whether its marginally more pointy tip significantly bespoils the local landscape.
  • There will be some sort of wait on International Clearance on a transmitter which mildly oversteps the boundaries of the Reserved Assignment List as our European chums decide to sit on our request in return for the fact they didn’t get as many complimentary pens as the British at RRC06.
  • Just as the radio stations are all hooked up there will be a last minute change of address for one of our services meaning a wheelbarrowful of equipment will need to be run around the corner and reinstalled at midnight.
  • There will be anxious posts on forums wondering why test transmissions haven’t started. The minute they do, the fact that the services are not in alphabetical order on the ensemble will be noted.
  • There will be a typo on the configuration documents which will be spotted before it goes live, saving a Country Music service from having a contracted 8 character name which breaks the broadcasting code and offends my mother.

You are welcome to email me with any queries and I will do my best to respond as we go along.